Underground

Moxley Tunnel

OntarioCompleted

Overview

Two 300-metre tunnels at 9 m × 9 m, with ground support and shotcrete — including the design and engineering.

Consbec excavated two 300-metre tunnels at 9 m × 9 m and installed the ground support and shotcrete, as a sub-contractor to the general contractor.

The contract included the design and engineering as well as the excavation — a full-scope tunnelling package rather than a drill-and-blast sub-contract.