Overview

Two portals and tunnel excavation across both mine sites, including ventilation set-up.

Consbec excavated two portals and the tunnels behind them at Red Lake, on two separate mine sites in the camp, and set up the ventilation.

A portal is the first cut into rock on an underground project. It sets the alignment, and the ground conditions, for everything driven behind it.