Casing drilling
Including the 1.6 km Mackenzie River crossing for Interprovincial Pipe Line / Enbridge.

Mainline | Distribution | Station
Since 1981
Consbec has been drilling and blasting pipeline right-of-way since 1981 — from the TransCanada Canadian Mainline through the Maritimes & Northeast Pipeline to Coastal GasLink. Mainline and distribution, trench and station work, in some of the roughest terrain in the country.
Technical
Including the 1.6 km Mackenzie River crossing for Interprovincial Pipe Line / Enbridge.
Up to 3 km of ditch rock drilled and blasted per day on the Maritimes & Northeast mainline.
Rollover capability for grade and side-slope work where conventional access isn't possible.
Purpose-built carriers and long-reach pumping for remote right-of-way with minimal access construction.
Track Record

Test drilling, plus right-of-way and mainline trench drilling and blasting, on sections 3 and 4 as a sub-contractor.
On the Right-of-Way






From the Archive



Pipeline Work
Talk to us early — access, terrain and rock conditions drive the schedule more than anything else.