Highway 11/17 Twinning

Thunder Bay to Nipigon, Ontario2019 – 2026

Twinning contracts on the corridor
5
First contract on Highway 11/17
2019
Trans-Canada traffic running beside the work
Open

The Work

Drill and blast across five contracts on the twinning of the Trans-Canada Highway between Thunder Bay and Nipigon — cutting rock for new lanes with traffic running alongside.

Highway 11/17 is the Trans-Canada between Thunder Bay and Nipigon. Twinning it means cutting new lanes through the rock along the north shore of Lake Superior while the existing lanes stay open to traffic.

We have drilled and blasted on five contracts along the corridor since 2019 — Red Rock, Dorion, Hurkett, Pearl and Shuniah.

The photographs here are from the Pearl section: drills working the cut metres from passing traffic, production benches through the winter, and finished rock walls beside the new alignment.

On Site

From the job

The divided highway curving past the rock cut, with drills and an excavator working the bench
The divided highway curving past the rock cut, with drills and an excavator working the bench
Drills on a bench above the highway as transport trucks pass below
Drills on a bench above the highway as transport trucks pass below
A finished rock wall standing beside the paved highway shoulder
A finished rock wall standing beside the paved highway shoulder
A winter production bench with clean pre-split walls, viewed from above
A winter production bench with clean pre-split walls, viewed from above
Blasted rock on the new alignment in spring, with the highway and a lake behind
Blasted rock on the new alignment in spring, with the highway and a lake behind